|
SOCAR told APA that during this period 388.04mn c.m of dry gas were delivered to Azerigas against the planned 390.70mn cubic meters with implementation of the forecast by 99.3 percent.
During this period SOCAR delivered 353.33mn c.m (132.7%), Oil and Gas Extraction Units 349.25 mn c.m (138.7%), Joint Ventures and Operating Companies 4.08 mn c.m (28.3%), Anshad Petrol 1.24mn c.m (58.5%), Consortium 141.62 mn c.m (55.1%).