|
Energy has been saved by 211 thousand AZN. The oil reception prognoses have been fulfilled by 107,9 %, but on oil processing - by 105,5%.
75,6 thousand tons of extra light oil have been produced at the expense of engineering processes. The prognoses have been fulfilled by 108,4%. The prognoses on production of diesel, lubricants, black oil and bitumen has been overfulfilled.
/AzerTAg/