
The construction of another tunnel-bridge complex is underway in Nizami district of Baku. The complex consists of a tunnel with seven entrances and exits and 3 bridges.
According to ANS PRESS, foreman Mahir Abbasov informed that the underground tunnel with a 4-lane road will have a length of 1000 meters and a width of 6 meters and three bridges will be built over it. The tunnel will stretch from the streets of Ali Mustafayev (market of the 3rd district) towards avenue Ziya Bunyadov.
The length of the new bridge directed from avenue Ziya Bunyadov to street Salamzade will be 700 m, width - 6 m.
The second bridge with length 500 and a width 5 meters will start on the street Salamzade and stretch toward street Ali Mustafayev and avenue Ziya Bunyadov.
The third bridge will connect the streets Salamzade and Rashid Mammadov. The parameters of this bridge are not yet specified. "Korpu Bina Tikinti" Ltd runs the construction.
/Vesti.az/