
Construction of the road length 36.5 km is planned in the Samukh region of Azerbaijan. The Samukh Region Executive Power reported that the road will connect 10 locations - Samukh-Fuzuli-Hajialli-Lac-Alibayramli-AsagiAgasibeyli-Yukhari Agas-beyli-Ahmedbeyli-Garabaglar Chobanabdalli-with a total population of 22, 600 people.
In addition, a bridge length 200 meters will be built over the Ganja river bridge, which will connect the villages Garabahlar and Ahmedbeyli. Construction work should begin in late 2012-2013.
/Day.Az/