
The work is underway on the reconstruction of the Hajigabul-Bulagli highway , OJSC Azeryolservis of the Azerbaijani Transport Ministry reported.
The length of the two-lane highway under reconstruction reaches 40.5km . The reconstruction work envisages the construction of 3 bridges, 4 crossings for animals, laying of pipes of different diameters, repair of the bridge over the Kura River.. The road will be put into operation in 2013.
/Day.Az/