
The works on construction of the first of four stages of Shahdagh Winter-Summer Tourism Complex are finishing.
The Ministry of Culture and Tourism told APA that this stage includes the establishment of infra-structure i.e. construction of gas, electric, water and communication systems and 32km road. Four-star hotel and elevator base and rope-ways will be built at that stage. The building of rope-ways for delivering the tourists to the ski jumping board is being continued. Elevators ?2,3,4,8 and 9 have been installed. Elevator ?7 is being installed now. The
The inner roads in the complex, and the bridges on the mountain stream were built. The 32km road joining the complex with Gusar Region’s center is being continued. The road’s quality, which meets the international standards, will ensure the unhampered and secure traffic movement. The sewage system of the hotel complex has been already constructed. The work is being continued on drinking water delivery system. The next stages include construction of ski-track and extension of living area.
/
APA/