|
As APA reports, the military load reached the Boyuk Kasik station at 8:00p.m yesterday. The echelon contains 400 military equipment and 1.5 thousand tons of military property.
The echelon passed Azerbaijan without making a stop. It was protected by a small unit of the base in Akhalkalak, Interior Troops and the militarized security unit of the State Railway Office.