TODAY.AZ / Business

104MW power plant to be opened in Baku

21 February 2007 [22:41] - TODAY.AZ
104MW Baku Multi-Fuelled Power Plant will be opened on Wednesday.

Azerenergy, the Azerbaijan national electricity company, told APA that the multi-fuelled generating plant was installed by Wartsila Corporation. Azerbaijani president Ilham Aliyev is also expected to take part in the official opening ceremony.

Azerenergy ordered five power plants, all based on multiple Wartsila 34SG gas-engined generating sets. The power plants, located in (87MW) Astara, Khachmaz, Nakhchivan and Sheki, have all been commissioned during 2006.

In addition, Wartsila Corporation was in December 2006, awarded a contract by Azerenergy, the Azerbaijan national electricity company, to deliver a multi-fuelled generating plant for a 300MWe power plant to be located at Sangachal, 50 km south of the capital Baku.

The plant will be equipped with 18 generating sets each powered by an 18-cylinder W?rtsil? 50DF engine, delivering 17 MW.

Wartsila will also deliver the power plant design, other principal equipment and all building materials, while undertaking supervision of the building and equipment installation.

Wartsila's 50DF engines give the plant considerable fuel flexibility. The engines will primarily run on natural gas, with a small quantity of pilot liquid fuel for ignition. However, it will also be possible to switch the engines over to heavy fuel oil if there is a problem with the gas supply, and the engines can also use light fuel oil. The engines will deliver the same power on all three fuels.

The plant is scheduled to be fully operational in October 2008.

URL: http://www.today.az/news/business/36825.html

Print version

Views: 1531

Connect with us. Get latest news and updates.

Recommend news to friend

  • Your name:
  • Your e-mail:
  • Friend's name:
  • Friend's e-mail: