|
Since June 4, over 6 million barrels (some 800 000 tons) of Azeri-Chirag-Guneshli oilfield crude has been transported via BTC pipeline to be loaded onto the ship at the Ceyhan terminal.
Currently, this pipeline transports 400,000 barrels of oil daily.
/AzerTAg/