Today.Az » Society » Nizami region does not follow instructions of Azerigas
16 March 2006 [09:55] - Today.Az
Houses in the R.Aghayev Street of Keshle settlement are not provided with natural gas.

As APA was told by residents of the R.Aghayev Street, they applied to the Azerigas Close Joint-Stock Company (CJSC), Baku city Head Production Gas Office (BakGas) and Nizami region Gas Exploitation Office (GEO) many times.

Although residents of the settlement were replied that their problem will be solved, no measures have been implemented in this direction.

According to residents, instructions and orders issued by the Azerigas chair are not fulfilled by organizations subordinated to him.

It should be noted in the response letter sent to resident by the Azerigas chair Alikhan Malikov Nizami GEO was instructed to control gas supply of the abovementioned territory.

In the response letter of BakGas it is noted that technical and organization measures aimed at construction of an additional gas pipeline to the territory for elimination of the existing shortcomings are currently implemented.

The chief of the building department of BakGas Mammadagha Mammadov told APA that pipes and other building materials have already been allocated for construction of the pipeline to that territory. Today Nizami GEO will be sent a letter to take those building materials.



Copyright © Today.Az