Today.Az » Business » Two additional oil-wells are expected to be drilled in "Guneshli"
02 May 2006 [08:35] - Today.Az
Representatives of State Oil Company (SOC) have visited oil-production platform No.19 in "Guneshli".

According to APA, the purpose of their visit was the discussion on drilling 2 additional wells not planned in prior project.

8 oil-wells were planned to be drilled in platform used since 2001. Highly-productive 7 oil-wells have been put into operation lately, producing 1470 ton quality oil totally a day.

The last, 8th layer is now being operated for gas production. Fields will be constructed for drilling additional oil-wells and other necessary facilities as soon as constructors get familiar with the project.



Copyright © Today.Az