According to the report, citing the JSC chief engineer Gurban Nazirov, 804.7 km of the total length of railways, which are in operation, are two-lane roads.

Moreover, 1271.4 km or 60% of railways in operation are electrified and 1,650 kilometers are equipped with an automated signal system, the report said.

The first railway with a length of 20 km has been built in Azerbaijan on the Baku-Surakhani-Sabunchi route.


/Trend/