|
Moving another 75 km, the pumped oil has already passed the pumping station #2 (PST-2) in the territory of Turkey.
Now, in whole, the BTC contains 6 million barrel of oil. Another 4 million barrel oil is needed to fill the remained 800 km of the pipeline, AzerTAg reports.
Loading of the first tanker in Ceyhan port will take place in June, which is to be ceremonially marked.